This is the begining, this is the day... (June 25 2010) |
All 186 holes drawn out and some drilled |
Register templates |
Beveling the edges
|
Lighting test
|
Rough beveling with flashing to be removed
|
Register plates painted
|
Gathering the switches and indicator lights
|
Molding control knobs
|
2 finished control knobs
|
2 coats of flat black
|
Indicator light casts. I may not use these
|
Plates and switches attached
|
vinyl tubing pieces added to hold the lights in place
|
Over 10 feet of tubing was required for this
|
Chaser lights plugged in
|
indicator light boxes installed
|
Case fabricated from wood and PVC pipe quarters
|
Graphics printed...
|
... and glued down
|
It wouldn't be complete without a cosmic radiation gauge
|
Done, and mounted on the office wall
|