This is the begining, this is the day...   (June 25 2010)
All 186 holes drawn out and some drilled

Register templates
Beveling the edges

Lighting test
Rough beveling with flashing to be removed

Register plates painted
Gathering the switches and indicator lights

Molding control knobs
2 finished control knobs

2 coats of flat black
Indicator light casts. I may not use these

Plates and switches attached
vinyl tubing pieces added to hold the lights in place

Over 10 feet of tubing was required for this
Chaser lights plugged in

indicator light boxes installed
Case fabricated from wood and PVC pipe quarters

Graphics printed...
... and glued down

It wouldn't be complete without a cosmic radiation gauge
Done, and mounted on the office wall

NEXT PAGE